Openness concerning GIEK's environmental policy: Current projects classified as category A. All GIEK cases are categorised into three groups, A to C, depending on the presumed environmental consequences and social impacts. Category A projects might entail considerable negative environmental consequences and impacts on local communities.

Category A

For projects classified as category A, GIEK will publish the environmental and social impact analysis here: 

Name

Country

Type

Report

Tanga Tanzania Heavy fuel thermal power.

EIA for 70MWTanga-Annex 6

EIA For70MW Majani Mapana TANGA

Published 23.02.12

Kinyezeri Tanzania Thermal Power Plant

ESIA Kinyerezi 20_02_2012 FINAL_COMPRESSED 1

Appendices 1 to 15

Published 23.02.12

Sawalkot India Energy, hydropower    

You will find the 1st part of the environmental report from the project in two separate files: 

Sawalkot fil 1
Sawalkot fil 2

2nd part, which will deal with social problems, is being prepared.

Published 25.01.06.

Qatalum Qatar Aluminum plant EIA-report and EIA-summary, look here: www.qatalum.com

Published 21.08.07
 

Guaigüí

 

Dominican Republic

 

Water and energy

EIA-rapport Guaigüí del I
EIA-rapport Guaigüí del II
EIA-rapport Guaigüí del III
EIA-rapport Guaigüí del VI
EIA-rapport Guaigüí del V

Published 13.03.08

Annex Guaigüí 
(spanish only)
Published 20.08.09

 Resettlement Action Plan

 Environmental Action Plan

  Environmental and Social Action Plan

 Mputa  Uganda Heavy fuel power plant and transmission lines. The project concerns the construction of a 57 MW power plant in addition to 132kV high-voltage lines, in order for the power to be transmitted to the main power grid. The line will be approx. 200 km long. The power plant will consist of 7 engines operated on heavy fuel, crude oil and diesel. In this plant, heavy fuel will be used to generate electricity. 7 MW will be used to operate the plant itself and approx. 50 MW will be transmitted to the high-voltage lines. 
 
EIA report Mputa
Annexes Mputa
Publisert 17.06.08

EIA transmisjonslinjer Mputa
Publisert 23.09.08
Kabaale Uganda Thermal Power Plant

EIA report Kabaale
Annexes Kabaale

Published 17.01.11

 

Reliance Industries Ltd.

 

India

 

Energy. Deliveries to the construction of the oil and gas field KG-D6 on the Indian shelf.

Contact GIEK for the EIA report.

Published 04.07.08
 

Las Placetas

 


Dominican Republic
 

 


Hydropower plant
 

EIA-rapport Las Placetas:
Chapter 1
Chapter 2
Chapter 3
Chapter 4
Chapter 5
Chapter 6
Chapter 7
Chapter 8
Tabeller chapter 8 (1)
Tabeller chapter 8 (2)
Chapter 9

Published 20.11.08

Socioeconomic survey
Compensation policy

Published 25.02.11

 Sakhalin Russia Delivery of two ferrries intended for transport of personnel. EIA-report:
www.sakhalinenergy.com 
 

Marine Operating Procedures and Guidelines

Published 25.05.09

Dubai LNG Regasification Project Dubai Fleet for stationary placement ESHIA-rapport:
Chapter 1
Chapter 2
Chapter 3
Chapter 4
Chapter 5
Chapter 6
Chapter 7
Chapter 8
Chapter 9
Chapter 10
Chapter 11
Chapter 12
Chapter 13
Binder
Contents
Title
Non-Technical Summary
Glossary

Appendix:
A
B
C
D
E
F
G
H
Binder
Title
Contents

Published 13.10.09

Ubungo

 

 Tanzania

 Gas power

 

VOL 1 100MW ESIA

Published 15.12.10

Bajo Frio  Panama

     Hydropower

 

Executive Summary

Esia complete

Published 15.12.10

 

Helguvik Iceland Silicon raw material for photovoltaic cell production

EIA Report Helguvik

Published 13.01.11

 


 

 

 

 

 

Category B

According to the OECD rules, information regarding B projects are to be published on an annual basis, after the policy has been issued:

Name

Country

Type

Report

 Namanve  Uganda  Energy, thermal power. Final report Namanve
Please contact GIEK for appendixes.

Policy issued in 2007.

       
       
       
       

 


 


Stakeholder Complaint Mechanism:
GIEK is required under OECD regulations to publish environmental and social impact information at least 30 days prior to granting a guarantee. Stakeholders wanting to raise a grievance or provide additional information with regard to negative environmental and social impacts are welcome to do so. For additional information, or to submit inquiries related to the complaint mechanism, please contact:
 

Øyvind Ajer
Ass. Managing Director, Underwriting Department
Phone.: 951 22 598
E-mail: oyvind.ajer@giek.no

Kamil Zabielski, Senior Advisor, Social and Human Rights Analysis  
Phone: 41044914 E-mail: kamil.zabielski@giek.no

Bjørn Egeland, Senior Advisor, Environmental analysis
Phone: 95925679 E-mail: bjorn.egeland@giek.no

 

Dictionary